Chief Operating Officer SEML, SERB & SERD Ikeda has a 25-year of professional career in the energy industry since 1998 with a robust technical background of reservoir engineering, integrated subsurface evaluation, field development planning, reservoir management and project development. Sachi Aratani Chief Financial Officer SEML & SERB Supreme Energy Head Office. Menara Sentraya, 23rd Floor Jl. Iskandarsyah Raya No. 1A, Kebayoran Baru Jakarta 12160 Indonesia +62 21 2788 2222 (Hunting) +62 21 2788 2333 Learn about the joint venture of PT Supreme Energy, ENGIE and Sumitomo to develop the Muara Laboh geothermal power plant in Solok Selatan, West Sumatra. The project started in 2010 with pre-feasibility study, exploration, construction and commercial operation of 80 MW capacity in 2019. Now Supreme Energy is in talks with PLN and the Ministry of Energy and Mineral Resources (ESDM) for the development of the Phase 2 Muara Laboh with a capacity of 65 MW. The development requires an investment of US $ 400 million and will start immediately after the PPA negotiations are completed. PT Supreme Energy Muara Laboh (SEML) proposes to develop the project as a grid-connected power plant to supply low-emission power to the Sumatera grid. The Ministry of Finance of the Republic of Indonesia granted the government a Guarantee Letter for the project in March 2012. PT Supreme Energy Muara Laboh (SEML) telah merampungkan Pembangkit Listrik Tenaga Panas Bumi (PLTP) Tahap-1 Muara Laboh dengan kapasitas 85 MW. Proyek ini akan memasok ke jaringan listrik Sumatera milik PT PLN dan mencapai 150 MW. Sementara, SEML juga sedang membangun PLTP Rantau Dedap dan Wilayah Kerja Panas bumi Gunung Rajabasa. ueeKh3K.

supreme energy muara laboh